NO | KODE | URAIAN | SATUAN | KAB KABUPATEN BULUNGAN | |||||
---|---|---|---|---|---|---|---|---|---|
TANJUNG SELOR | TANJUNG PALAS TIMUR | TANJUNG PALAS/TENGAH | TANJUNG PALAS UTARA/SEKATAK | TANJUNG PALAS BARAT/PESO | BUNYU | ||||
1 | A1 | Batu Asahan | Buah | 75,000.00 | 75,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
2 | A2 | Benang Nylon | Roll | 25,000.00 | 25,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
3 | A3 | Bethel | Buah | 50,000.00 | 50,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
4 | A4 | Bodem | Buah | 250,000.00 | 250,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
5 | A5 | Cangkul | Buah | 105,000.00 | 105,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
6 | A6 | Cangkul (lengkap) | Buah | 125,000.00 | 125,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
7 | A7 | Ember Cor | Buah | 20,000.00 | 20,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
8 | A8 | Gergaji besi | Buah | 48,000.00 | 48,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
9 | A9 | Gergaji Kayu | Buah | 185,000.00 | 185,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
10 | A10 | Gerobak Pasir | Buah | 785,000.00 | 785,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
11 | A11 | Gunting Pemotong | Buah | 420,000.00 | 420,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
12 | A12 | Hammer Cabut | Buah | 110,000.00 | 110,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
13 | A13 | Hammer konde | Buah | 150,000.00 | 150,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
14 | A14 | Kain Majun | Kg | 30,000.00 | 30,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
15 | A15 | Kasut Kayu | Buah | 35,000.00 | 35,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
16 | A16 | Kereta Dorong /Gerobak | Buah | 678,000.00 | 678,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
17 | A17 | Kuas | Buah | 23,000.00 | 23,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
18 | A18 | Kunci Pembengkok | Buah | 25,000.00 | 25,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
19 | A19 | Linggis | Buah | 200,000.00 | 200,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
20 | A20 | Pahat beton | Buah | 65,000.00 | 65,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
21 | A21 | Palu | Buah | 150,000.00 | 150,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
22 | A22 | Tang Pemotong Kawat | Buah | 95,000.00 | 95,100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
23 | J1 | Pekerja | OH | 133,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
24 | J2 | Tukang | OH | 160,950.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
25 | J3 | Mandor | OH | 177,600.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
26 | J4 | Operator | OH | 166,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
27 | J5 | Pembantu Operator | OH | 133,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
28 | J6 | Sopir / Driver | OH | 155,400.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
29 | J7 | Mekanik | OH | 166,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
30 | J8 | Kepala Tukang | OH | 166,500.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
31 | J9 | Surveyor | OH | 222,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
32 | J10 | Pembantu Juru Ukur | OH | 133,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
33 | J11 | Juru Ukur | OH | 222,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
34 | J12 | Drafter CAD | OH | 172,050.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
35 | H1 | Asphalt Mixing Plant 50 t/h | Jam | 18,100,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
36 | H2 | Asphalt Finisher | Jam | 1,700,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
37 | H3 | Buldozer 180 Hp (D 7 G) | Jam | 1,500,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
38 | H4 | Dump Truck 3-4 M3 | Jam | 1,200,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
39 | H5 | Motor Grader > 100 Hp | Jam | 1,400,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
40 | H6 | Wheel Loader 1,0 - 1,6 M3 | Jam | 1,100,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
41 | H7 | Tandem Roller 6 - 8 t | Jam | 900,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
42 | H8 | Tire Roller 6 - 10 t | Jam | 1,100,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
43 | H9 | Vibratory Roller 10 Ton | Jam | 650,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
44 | H10 | Stamper | Jam | 500,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
45 | H11 | Jack Hammer | Jam | 500,000.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |